The expansion of the Panama canal and its ruling international contractA mega-project sailing in troubled waters?

  1. Irene Nuviala Lapieza 1
  1. 1 Universidad de Zaragoza
    info

    Universidad de Zaragoza

    Zaragoza, España

    ROR https://ror.org/012a91z28

Journal:
Revista electrónica de estudios internacionales (REEI)

ISSN: 1697-5197

Year of publication: 2017

Issue: 33

Type: Article

DOI: 10.17103/REEI.33.12 DIALNET GOOGLE SCHOLAR lock_openDialnet editor

More publications in: Revista electrónica de estudios internacionales (REEI)

Abstract

The world has recently witnessed the inauguration of the Panama Canal Expansion. This civil engineering mega-project, resulting from a particular historical, political and economic background, is going to globally reconfigure the maritime transport. The Panama Canal Expansion includes the creation of a new lane by the design and construction of the third set of locks, which has undergone to a qualified tender process. The relationships between the parties (the Spanish led consortium Grupo Unidos por el Canal as the contractor and the Panama Canal Authority as the Employer) and the different actors of the project are configured by an extraordinarily complex international contract drawn from a FIDIC form but substantially amended taking into account the particularities of this mega-project. The contractual provision ruling the dispute resolution terms sets forth a multi-tier clause that addresses in first place to the negotiation between the parties, continues with a Dispute Resolution Board (DAB) and finally ends with an arbitration. The referred escalated clause shall be insightfully analyzed in this paper, in light of the status quo of the worth million claims filed by the contractor up to this date.

Bibliographic References

  • BLESSING, M., “Drafting arbitration clauses”, Worldwide Forum on the Arbitration of Intellectual Property Disputes, March 3-4, 1994, Geneva, Switzerland, http://www.wipo.int/amc/en/events/conferences/1994/blessing.html.
  • BOGDANICH, W; WILLIAMS, J.; MÉNDEZ, A.G., “El nuevo Canal de Panamá: lo barato sale caro”. June 24th, 2016, New York Times, https://www.nytimes.com/es/2016/06/24/el-nuevo-canal-de-panamalo-barato-sale-caro/
  • CEREZO DE DIEGO, P., “El Canal de Panamá y su régimen jurídico”, Anuario Jurídico y Económico Escurialense, XLIII (2010).
  • CHERN, C. “A fair fight”, The architects’ journal, Jun 8, 2006.
  • CONDON, N., “A toda velocidad: los puertos del sudeste se preparan para la ampliación de canal de Panamá”, Econsouth Federal Reserve Bank of Atlanta, Volume 12, No. 2, Third quarter 2010, https://www.frbatlanta.org/-/media/documents/regionaleconomy/econsouth/10q3southeastportsespanol.pdf
  • CUISINIER, J., “Typical Construction Dispute Problems”, Preventing Delay and Disruption of Arbitration / Effective Proceedings in Construction Cases, Kluwer Law International, 1991, p. 366.
  • DEDEZADE, T., “The legal justification for the “enforcement” of a “binding” decision under the FIDIC 1999 Red Book”, Construction law international, Volume 7 Issue 1 March 2012, pp. 13-20, http://corbett.co.uk/wp-content/uploads/Taner-CLINT-Article-2.pdf
  • DENGO, M.; RIVADENEIRA, S., “Puertos Se Preparan para Post Panamax”. This contribution can be found in the Panama Canal website, in the following link: http://www.pancanal.com/esp/articulos/articulo -002.html.
  • DRAETA, U., “Dispute resolution in international construction linked contracts”, Revue de Droit des Affaires Internationales, No. 1, 2011, pp. 69-83.
  • ERBE, A., "Evaluating main order contract forms for Major Industrial Plant Projects (MIPP) with respect to completion and performance of design risk allocation", Freiberger Arbeitspapiere Technische Universität, Fakultät für 2013, http://www.econis.eu/PPNSET?PPN=81534290X
  • FACH GÓMEZ, K. “Enforcing Global Law: International arbitration and informal regulatory instruments”, Journal of legal pluralism and unofficial law, 2015, pp. 112-139
  • GOMM-SANTOS, M., “What's new in Latin American ADR?”, Dispute Resolution Journal, 65(1), 2010, pp. 10-12
  • HEREDIA CAMPOS, M. C., “Ampliación del canal de Panamá”, Revista del Ministerio de Fomento, No. 652, July-August 2015, p. 60-62
  • HERNÁNDEZ GONZÁLEZ, F.L. “La problemática del restablecimiento del equilibrio económico en la contratación pública internacional: La crisis de la ampliación del canal de Panamá”, Revista de Administración Pública, No. 194, May-August 2014, pp. 475-508, at p. 489 et seq, http://www.cepc.gob.es/Controls/Mav/getData.ashx?MAVqs=~aWQ9MzcwNDcmaWRlPTEwMzcmdXJsPTc0Jm5hbWU9RnJhbmNpc2NvX0wuX0hlcm7DoW5kZXpfR29uesOhbGV6X1JBUDE5NC5wZGYmZmlsZT0yNjk2NTMxODA0MjYucGRmJnRhYmxhPUFydGljdWxvJmNvbnRlbnQ9YXBwbGljYXRpb 24vcGRm
  • JAEGER, A.V.; HÖK, G. S., FIDIC - A Guide for Practitioners, Springer Berlin, Heidelberg, 2010.
  • JAFFE, M. E.,; MCHUGH, R. J., “U.S. Project disputes: Has the time to consider adjudication finally arrived?”, Dispute Resolution Journal, 62(2), 2007.
  • JENKINS, J., “Chapter two: Key features of construction contracts”, International construction arbitration law, Arbitration in context series, vol. 3, Kluwer Law International, 2013, p. 20
  • JIMÉNEZ, M. “EE UU intentó evitar que Sacyr lograse las obras del Canal de Panamá”, El País, December 17th, 2010 http://internacional.elpais.com/internacional/2010/12/17/actualidad/1292540416_850215.html
  • KLEE, L., International construction contract law, Wiley-Blackwell Chichester, 2015, pp. 361-364
  • LÓPEZ DE ARGUMEDO PIÑEIRO, A., “Multistep dispute resolution clauses”, Mondaq, January 2011, http://www.mondaq.com/article.asp?articleid=117062.
  • LUDLOW, M.R.; REES J.G., “Engineer’s Role under FIDIC Standard Conditions of Contract”, (1992) Int’l Bus. Lawyer, p. 525.
  • MELÉNDEZ, J., “El arbitraje por el sobrecoste del Canal de Panamá comienza este lunes 21 de julio”, El País, July 21st, 2014, San José (Costa Rica) http://internacional.elpais.com/internacional/2014/07/21/actualidad/1405910422_948794.html.
  • MORTIMER-HAWKINS, M. “Clause 20, Dispute Resolution”, FIDIC Contracts Committee, http://fidic.org/sites/default/files/24%20CLAUSE%2020,%20DISPUTE%20RESOLUTION.pdf
  • NICKLISCH, F, “The Role of the Engineer as Contract Administrator and Quasi-arbitrator in International Construction and Civil Engineering Projects”, 1990 I.C.L.R, p. 322.
  • NUVIALA LAPIEZA, I.; FACH GÓMEZ, K., “El contrato llave en mano”, ABRIL RUBIO, A. Coord., Los contratos mercantiles y su aplicación práctica, Wolters Kluwer, 1st, Ed., Barcelona, 2017, p. 559.
  • OLEO, F., “Revolución en el comercio mundial [Ampliación del Canal de Panamá]”, Actualidad Económica, 1 de abril de 2016, p.21
  • OVERCASH, A. L., “Introducing a novel ADR technique for handling construction disputes: Arbitration”. The Construction Lawyer, 35(1), 2015.
  • PELÁEZ, J., “Diseño y construcción del tercer juego de esclusas del canal de Panamá”, Revista de obras públicas, No. 3572, January 2016. http://www.sacyr.com/es_es/images/Revista%20Obras%20Publicas_Jos%C3%A9Pel%C3%A1ez_Panama_tcm29-25446.pdf
  • RAMANI GARIMELA, S.; AHMAD SIDDIQUI, N., “The enforcement of multi-tiered dispute resolution clauses: contemporary judicial opinion”, Iium Law Journal, Vol. 24, No. 1, 2016, pp. 157-191.
  • RUBINO-SAMMARTANO, M., “The role of the Engineer – Myth and Reality”, Trasnational Dispute Management (TDM), 2017, number 2, pp. 1 et seq
  • SCHMITZ, J. “The Panama Canal Expansion, Executive Sponsor-Panama Canal Expansion Program”, ASCE Structural Engineering Conference and Workshop, November 4th, 2013.
  • SEPPÄLÄ, C.R., “FIDIC contracts and Latin America”, Simposio Latinoamericano de Arbitraje en la Industria de la Construcción, CAIC – Ensenada, Mexico, September 30th, 2016.
  • TEVENDALE, C.; AMBROSE, A.; NAISH, V., “Multi-tier dispute resolution clauses and arbitration”, Turkish Commercial Law Review, Vol. 1, No. 1, February 2015, pp. 31-40, at p. 32.
  • THOMAS, D., “Lessons from the Wembley litigation”, Construction Law International, Volume 4 No. 1 March 2009, pp. 28-30, http://www.ibanet.org/Document/Default.aspx?DocumentUid=A277ECDE-64E0-45E6-A0BD7F7A82AB4C49.
  • VAN LANGELAR, A., “Dispute boards – An introduction”, Civil Engineering, August 2014
  • VENTOSA, J.R. “Un hito global. La ampliación del Canal de Panamá obra con protagonismo español, reconfigurará el comercio mundial”, Revista del Ministerio de Fomento, Nº 664, 2016, pp. 10-13 https://www.fomento.gob.es/NR/rdonlyres/67195B33-20A5-4CC8-8256- DA4D7438869B/139298/Se10_17.pdf.
  • WIEZEL, J.P., “Costeffective construction arbitration”, The construction lawyer, 2011, pp. 15-45
  • Y'BARBO, D., “Is extrinsic evidence ever necessary to decide claim construction disputes - Part II”, 82 J. Pat. & Trademark Off., Soc'y, 101, 2000, pp. 101-145.
  • ZUCKERMAN, S., “Comparing cost in construction arbitration and litigation”, Dispute resolution journal, May/July 2007, pp. 70-75